Thursday, October 13, 2011

Steady Progress

Meredith and Josie are refining their skills.  Here they are assisting with installing the pumpkin face bunk support located just aft of frame 124.


Mist's aft most bay is complete.  All hull stringers are installed and the entire bay is coated with three coats of epoxy.  Coating the interior has been tedious.  First I applied two coats of epoxy, let it cure, sand the surface smooth and remove all of the gloss, and finally apply the finish coat.  The wood should be well protected from moisture.  I'm moving onto complete the bay between frames 124 and 169 next.

No comments:

Post a Comment